• Home
  • About Us
    • About M&G
    • Our Staff
    • Careers
  • Concrete
  • Grading
  • Paving
  • Underground
  • Habitat Restoration
  • Past Projects
    • -4th Street Paving
    • -Bon Air Bridge Retrofit
    • -Corte Madera Sewer Pump Station
    • -Waldo Interchange
    • -Cullinan Ranch Wetlands
    • -FHWA
    • -Kentfield Force Main
    • -MMWD Concrete Pipe Road
    • -Putah Creek Restoration
    • -Putah Creek Pathway
    • -San Mateo Floodwalls
    • Bridge Placement
  • Contact Us
Maggiora & Ghilotti

Maggiora & Ghilotti

  • Home
  • About Us
    • About M&G
    • Our Staff
    • Careers
  • Concrete
  • Grading
  • Paving
  • Underground
  • Habitat Restoration
  • Past Projects
    • -4th Street Paving
    • -Bon Air Bridge Retrofit
    • -Corte Madera Sewer Pump Station
    • -Waldo Interchange
    • -Cullinan Ranch Wetlands
    • -FHWA
    • -Kentfield Force Main
    • -MMWD Concrete Pipe Road
    • -Putah Creek Restoration
    • -Putah Creek Pathway
    • -San Mateo Floodwalls
    • Bridge Placement
  • Contact Us

FHWA – Fort Cronkite – Alexander Ave, Bunker & Mitchell Roads

View fullsize Alexander Avenue Starting Cut on Half to One Rock Slope
View fullsize Alexander Avenue Second Day of Rock Slope Excavation
View fullsize Alexander Avenue Rock Slope Excavation of Chert Material approaching blue rock cut section
View fullsize Loading out Chert Material from Alexander Cut
View fullsize 80' above Alexander Ave performing slope rounding and starting half to one cut slope
View fullsize D10 arrives on-site for blue rock ripping on Alexander Cut
View fullsize Unloading D10 without blade to rip blue rock on Alexander Cut
View fullsize Loading out blue rock from Alexander Cut to be processed onsite for use as Base Rock
View fullsize Finishing cut of Alexander Ave
View fullsize Fill of historic quarry site above Marine Mammal Center with material from Alexander Avenue
View fullsize 349 and 336 excavators on top of Blue Rock Base Rock stockpile from Alexander Avenue Cut
View fullsize D6N placing topsoil over historic quarry fill from Alexander Ave cut material
View fullsize Installation of MSE wall on Alexander Avenue below rock slope cut
View fullsize MSE wall on Alexander Avenue nearing completion
View fullsize Installing new drain pipe below MSE wall below Alexander Avenue
View fullsize Completed MSE wall after staining rock face
View fullsize Shoulder Widening below MSE wall on Alexander Avenue
View fullsize Removing some of the 30,000 LF of wattles placed for storm water protection
View fullsize Completed Alexander Avenue Cut and MSE wall from above near Hwy 101 Waldo tunnels
View fullsize Historic Quarry completed with slope stabilization
View fullsize Rocky Electrical Trench excavation at new Marine Mammal Center Parking Lot
View fullsize Grading of new Marine Mammal Center Parking Lot from above at Historic Quarry
View fullsize New Marine Mammal Center Parking Lot with restore quarry fill in background
View fullsize Clearing above Surfer Lot at Rodeo Beach for wetland restoration work
View fullsize Restored Surfer Lot after stabilization of slopes
View fullsize Rolling Rock Base before paving at Rebuilt Rodeo Beach Parking lot
View fullsize Paving Rebuilt Rodeo Beach Parking Lot
View fullsize Rolling Asphat Pavement at Rebuilt Rodeo Beach Parking Lot
View fullsize Wetland Restoration of Surfer Lot and Rebuilt Rodeo Beach Parking Lot
View fullsize Milling Mitchell Road for Regarding and Repaving
View fullsize Milling of Bunker Road for Regrading and Paving
View fullsize Drilling of Piers for Timer Lagging Wall on Bunker and Mitchell Roads
View fullsize Finished Timer Lagging Wall on Bunker and Mitchell Roads
View fullsize Paving Mitchell Road First Lift
View fullsize Paving Mitchell Road Second Lift
View fullsize Line of bottom dumps ready to pave on Mitchell and Bunker Roads
View fullsize Paving Crew catching a ride back for next lift
View fullsize Paving Field Road next to Nike Missle Site with new  Cat 1055 paver and Topcon Paving Equipment
View fullsize Paving along Bunker Road
View fullsize Paving thruogh Capehart Housing on Bunker Road
View fullsize Finishing Paving approaching One Way Tunnel on Bunker Road
View fullsize Rolling Asphalt Pavement on Bunker Road
View fullsize Touching Up Fog Seal on Bunker Road
View fullsize Shoulder Backing with Road Widener along Bunker Road
View fullsize Cleaning Up Drainage Ditches along Bunker Road as project comes to close
View fullsize Subex of Soft Subgrade at new Parking Lot accross from Horse Stables
View fullsize Track Walking Slopes at new Parking Lot next to Horse Stables
View fullsize Paddle Wheel trimming base rock grade at new Parking Lot near Horse Stables